毕业论文网 > 毕业论文 > 理工学类 > 电气工程及其自动化 > 正文

淮匠十万千瓦抽水蓄能电厂联入电网设计

 2022-11-12 02:11  

论文总字数:33544字

摘 要

本次设计的题目为“淮匠十万千瓦抽水蓄能电厂接入系统设计”,设计的主要内容为:通过技术经济比较,确定电厂接入电力系统的方式;拟定发电厂的电气主接线;选择发电厂主变;选择电气设备并编写相关的应用程序。

文章大体分为七个章节,第一章分析了原始材料,包括了系统的电源情况以及负荷情况。第二章首先进行了有功功率平衡计算,从而大致确定了系统中发、用电情况。然后确定了电厂接入系统的电压等级,拟定了三种接入系统的方案,并对三种方案进行了详细的经济技术比较,最后确定了方案三是最佳的接线方案。第三章确定了发电厂的主接线以及发电厂的主变。第四章是对最佳接线方案进行了详细的潮流计算,包括最大负荷和最小负荷两种情况下的潮流计算。第五六章主要是解决电气设备的选择问题,首先第五章进行了必要的短路计算,然后第六章确定了电气设备,电气设备包括:断路器、隔离开关、电压互感器、电流互感器、高压熔断器。第七章设计了相关的应用程序来进行电气设备的选择。

关键词:电厂接入系统设计;有功平衡;潮流计算;短路计算;电气设备选择

Abstract

The title of this design is "Huaijiang 100MW Pumped Storage Power Plant Access System Design". The main content of the design is: determine the way the power plant is connected to the power system through technical and economic comparison; draw up the main electrical wiring of the power plant; Select the main transformer of the power plant; select electrical equipment and write related application programs.

The article is roughly divided into seven chapters. The first chapter analyzes the original materials, including the power supply and load conditions of the system. The second chapter first carries on the active power balance calculation to roughly determine the power generation and consumption in the system. Then the voltage level of the power plant's access system was determined, three options for accessing the system were drawn up, and a detailed economic and technical comparison of the three options was carried out. Finally, the third option was determined to be the best wiring option. The third chapter determines the main wiring of the power plant and the main transformer of the power plant. The fourth chapter is a detailed power flow calculation for the best wiring scheme, including the power flow calculation under the maximum load and the minimum load. The fifth and sixth chapters are mainly to solve the selection problem of electrical equipment. First, the fifth chapter carries out the necessary short-circuit calculations, and then the sixth chapter determines the electrical equipment. The electrical equipment includes: circuit breakers, disconnectors, voltage transformers, current transformers , High-voltage fuse. At the seventh chapter, related application programs are designed to select electrical equipment.

Keywords: power plant connection system design; active power balance; power flow calculation; short-circuit calculation; electrical equipment selection

目录

摘要 I

Abstract II

第一章 原始资料分析 1

1.1 发电厂、变电所的地理位置图 1

1.2 电源情况分析 1

1.3 负荷资料分析 1

第二章 确定电站接入系统的方式 2

2.1 有功功率平衡计算 2

2.2 电压等级的选择 3

2.3 电力网接线方案初步选择 4

2.4 确定最佳接线方案 18

第三章 发电厂电气主接线及主变的确定 19

3.1 发电厂电气主接线的确定 19

3.2 发电厂主变的确定 19

第四章 最佳接线方案的潮流计算 20

4.1最大负荷情况下的潮流计算 20

4.2 最小负荷情况下的潮流计算 23

4.3 潮流计算结果 23

第五章 短路电流计算 25

5.1 短路点的计算 25

5.2 短路计算结果 29

第六章 电气设备的选择 30

6.1 断路器和隔离开关的选择 30

6.2 电流互感器的选择 33

6.3 电压互感器选择 34

6.4 高压熔断器选择 35

第七章 选择隔离开关的程序设计 36

计算书 38

致谢 53

参考文献 54

附录 55

第一章 原始资料分析

1.1 发电厂、变电所的地理位置图

原有电力系统接线图及新厂的位置下图。