九乡河闸站项目深基坑监测方案设计(P)毕业论文

 2022-03-11 09:03  

论文总字数:16274字

摘 要

在经济水平飞快提升的最近几十年间,各种高楼如春笋般拔地而起。建筑物基坑开工早已施挖的深度愈来愈大,范围也愈来愈广,高深度、广面积成为基坑的发展目标,同时周围的环境状况也趋于越来越繁杂,导致深基坑工程开工施挖的展开的难度愈来愈大。为了确保深度基坑开工施挖的安全进行,以及获取关于基坑支护方案的相关文献资料,必须全程监控该基坑工程的生产过程。本论文主要分成四个章节来阐述,前两章主要就该工程的各种相关情况进行简单介绍,第三章是以南京市九乡河闸站基坑监测项目为例,就基坑监测方案展开全面的分析,是全文的重点,第四章则简单阐述监测数据处理与安全保障措施的重要性。该监测项目包括支护结构顶端水平与沉降位移、深层水平位移、周边围墙沉降位移、周边油罐沉降位移监测。在观测过程当中,相关单位应及时向该项目设计部门、施工部门、监理部门等各部门报告所得到的相关数据,提高施工水平的信息化程度。

关键词: 水平位移 沉降位移 深层水平位移

Jiuxiang penstock station foundation pit monitoring project

Foundation pit monitoring technology solutions

Abstract

In the recent decades of rapid improvement in the economic level, all kinds of tall buildings sprung up everywhere. The excavation of the foundation of the building has been excavated more and more depth, the scope is more and more wide, high depth, wide area has become the development goal of the foundation pit, while the surrounding environment also tends to more and more complicated, Pit engineering started digging the difficulty of expanding more and more. In order to ensure the safety of the excavation of the foundation pit and the relevant literature on the foundation pit support program, the production process of the foundation pit project must be monitored throughout. This paper is divided into four chapters to elaborate, the first two chapters mainly on the various aspects of the project related to a brief introduction, the third chapter is the Nanjing Jiuxianghe gate station pit monitoring project, for example, A comprehensive analysis is the focus of the paper, the fourth chapter is a brief description of the importance of monitoring data processing and security measures. The monitoring project includes the top level of the support structure and the settlement displacement, the deep horizontal displacement, the surrounding wall settlement displacement, the surrounding tank settlement displacement monitoring. In the observation process, the relevant units should promptly report to the project design department, construction department, supervision department and other departments to obtain the relevant data to improve the level of information construction level.

Key Words: horizontal displacement;deposition distance;deep horizontal displacement

目录

摘 要 I

Abstract II

一章.基坑监测项目概述 5

1.1.工程概况 5

1.2工程条件及环境状况 5

1.2.1基坑概况 5

1.2.2工程地质概况 5

1.2.3周边环境 8

第二章 .基坑监测基础知识 9

2.1 监测工程前期策划 9

2.1.1监测目的 9

2.1.2监测内容 9

2.1.3监测方法 10

2.2基坑监测方案制订规范 10

2.2.1监测方案编制依据 10

2.2.2监测项目界限报警值 10

2.3监测组织方案 11

2.3.1监测周期 11

2.3.2监测频率 11

2.3.3反馈程序 12

2.3.4人员安排 12

2.4 监测工程所需仪器 12

第三章 .基坑监测技术设计方案 13

3.1支护结构顶端水平位移及垂直位移(数据分析) 14

3.1.1监测目的 14

3.1.2监测手段 14

3.1.3测点布置 14

3.1.4测点埋设 14

3.1.5数据分析 15

3.2深层水平位移监测 19

3.2.1监测目的 19

3.2.2监测手段 20

3.2.3测点布置 20

3.2.4测点埋设 20

3.3周边围墙沉降监测 21

3.3.1监测目的 21

3.3.2监测手段 21

3.3.3测点布置 22

3.3.4测点埋设 22

3.4周边油罐沉降监测 22

3.4.1监测目的 22

3.4.2监测手段 22

3.4.3测点布置 22

3.4.4测点埋设 23

3.5现场巡视 26

第四章.基坑监测结果处理与安全准则 27

4.1资料处理与成果提交 28

4.2应急预案 29

4.3基坑监测质量体系与安全保障 29

结语 30

致谢 31

参考文献 33

第一章.基坑监测项目概述

1.1.工程概况